{"id":5443,"date":"2026-10-01T01:10:31","date_gmt":"2026-10-01T01:10:31","guid":{"rendered":"https:\/\/jmbipvtech.com\/?p=5443"},"modified":"2026-09-30T08:17:33","modified_gmt":"2026-09-30T08:17:33","slug":"commercial-solar-roof-tiles-guide","status":"publish","type":"post","link":"https:\/\/jmbipvtech.com\/es\/commercial-solar-roof-tiles-guide\/","title":{"rendered":"Commercial Solar Roof Tiles: A Guide for Business Roofs"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"5443\" class=\"elementor elementor-5443\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d8c09f0 e-flex e-con-boxed e-con e-parent\" data-id=\"d8c09f0\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-b56c645 elementor-widget elementor-widget-text-editor\" data-id=\"b56c645\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<h2 data-source-line=\"1-1\">Commercial Solar Roof Tiles: What Contractors, EPCs and Architects Need to Know Before Specifying<\/h2><p data-source-line=\"3-3\"><img decoding=\"async\" title=\"Commercial solar roof tiles on a pitched business roof\" data-src=\"https:\/\/jmbipvtech.com\/wp-content\/uploads\/2026\/08\/solar-roof-tiles.jpg\" alt=\"Commercial solar roof tiles installed on a pitched business roof\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" class=\"lazyload\" style=\"--smush-placeholder-width: 1000px; --smush-placeholder-aspect-ratio: 1000\/1000;\" \/><\/p><p data-source-line=\"7-7\">More businesses now want their buildings to make power, not just use it. But for a lot of commercial roofs, the usual answer of rows of racked panels bolted on top doesn&#8217;t fit. A retail flagship on a busy street, a hotel in a heritage zone, or a corporate campus with a strict design code often can&#8217;t live with the look of a racked array. That&#8217;s why more projects are moving from traditional solar panels to <strong>commercial solar roof tiles<\/strong>.<\/p><p data-source-line=\"9-9\"><strong>Tejas solares<\/strong> are roofing units with solar cells built into them. They keep water out the way normal tiles do, and they also make electricity. The industry calls this <strong>BIPV (Building-Integrated Photovoltaics)<\/strong>, which means the solar part <em>is<\/em> the building material rather than something added later. Racked panels are called <strong>BAPV (Building-Applied Photovoltaics)<\/strong>, which means they are mounted onto a finished roof.<\/p><p data-source-line=\"11-11\">This matters most to the people who have to deliver the building: roofing and curtain wall contractors, PV EPCs and energy service providers, building material distributors, and the architects and design institutes who sign the drawings.<\/p><p data-source-line=\"13-13\">This guide covers where solar roof tiles and panels actually differ, which commercial buildings suit tiles (and which don&#8217;t), the real benefits and tradeoffs, and what each trade needs to get right on site. The aim is to help you advise clients on renewable energy spending with numbers, not guesses.<\/p><blockquote data-source-line=\"15-15\"><p data-source-line=\"15-15\"><strong>Quick definition (for featured snippets):<\/strong> Commercial solar roof tiles are building-integrated photovoltaic (BIPV) roofing units that replace conventional roof tiles on business buildings. They provide both weatherproofing and electricity generation, and they offer a flush, architectural look that rack-mounted solar panels cannot match.<\/p><\/blockquote><h3 id=\"key-terms-at-a-glance\" data-source-line=\"17-17\">Key Terms at a Glance<\/h3><div class=\"table-container\"><table class=\"table-scroll-init\" data-source-line=\"19-27\"><thead data-source-line=\"19-19\"><tr data-source-line=\"19-19\"><th>Term<\/th><th>Plain-English Meaning<\/th><th>Example<\/th><\/tr><\/thead><tbody data-source-line=\"21-27\"><tr data-source-line=\"21-21\"><td>BIPV<\/td><td>Solar that <em>is<\/em> the building material<\/td><td>A solar tile that replaces a clay tile<\/td><\/tr><tr data-source-line=\"22-22\"><td>BAPV<\/td><td>Solar that is mounted <em>onto<\/em> the building<\/td><td>Racked panels on a finished metal roof<\/td><\/tr><tr data-source-line=\"23-23\"><td>kWp (kilowatt-peak)<\/td><td>Rated output under standard lab test conditions<\/td><td>A 100 kWp roof delivers about 100 kW at full sun<\/td><\/tr><tr data-source-line=\"24-24\"><td>W\/m\u00b2 (power density)<\/td><td>Watts produced per square meter of roof<\/td><td>Tiles often land at 120\u2013170 W\/m\u00b2<\/td><\/tr><tr data-source-line=\"25-25\"><td>Roof replacement offset<\/td><td>Roofing cost you avoid because the solar tile <em>is<\/em> the roof<\/td><td>Skipping $150\/m\u00b2 of conventional tiles<\/td><\/tr><tr data-source-line=\"26-26\"><td>Dead load<\/td><td>The permanent weight a roof structure carries<\/td><td>Glass solar tiles at about 15\u201325 kg\/m\u00b2<\/td><\/tr><tr data-source-line=\"27-27\"><td>MLPE<\/td><td>Module-level power electronics (microinverters or optimizers)<\/td><td>One optimizer per tile group to limit shading losses<\/td><\/tr><\/tbody><\/table><\/div><hr data-source-line=\"29-29\" \/><h2 data-source-line=\"31-31\">Differences Between Solar Roof Tiles and Panels<\/h2><p data-source-line=\"33-33\">Solar roof tiles and solar panels do the same job, turning sunlight into electricity. They differ a lot in design, installation, and appearance, and those differences decide who does the work, how the bid is structured, and where the risk sits.<\/p><h3 id=\"physical-characteristics\" data-source-line=\"35-35\">Physical Characteristics<\/h3><p data-source-line=\"37-37\">A standard solar panel is a large framed module, about 2 m\u00b2, mounted on rails above the existing roof covering. The roof underneath still has to keep the water out on its own.<\/p><p data-source-line=\"39-39\">A solar roof tile is smaller and interlocks with the tiles or battens around it. It sits in the same plane as the roof. The tile, its flashings, and the underlayment together form the weatherproof layer.<\/p><p data-source-line=\"41-41\"><img decoding=\"async\" title=\"Solar photovoltaic roof tiles with interlocking profile\" data-src=\"https:\/\/jmbipvtech.com\/wp-content\/uploads\/2026\/08\/solar-photovoltaic-roof-tiles.jpg\" alt=\"Close-up of solar photovoltaic roof tiles showing interlocking profile\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" class=\"lazyload\" style=\"--smush-placeholder-width: 1000px; --smush-placeholder-aspect-ratio: 1000\/1000;\" \/><\/p><h3 id=\"side-by-side-comparison\" data-source-line=\"43-43\">Side-by-Side Comparison<\/h3><div class=\"table-container\"><table class=\"table-scroll-init\" data-source-line=\"45-55\"><thead data-source-line=\"45-45\"><tr data-source-line=\"45-45\"><th>Factor<\/th><th>Rack-Mounted Solar Panels (BAPV)<\/th><th>Commercial Solar Roof Tiles (BIPV)<\/th><\/tr><\/thead><tbody data-source-line=\"47-55\"><tr data-source-line=\"47-47\"><td>Role<\/td><td>Energy only<\/td><td>Roofing and energy<\/td><\/tr><tr data-source-line=\"48-48\"><td>Typical power density<\/td><td>190\u2013230 W\/m\u00b2<\/td><td>120\u2013170 W\/m\u00b2 (lower for colored or curved tiles)<\/td><\/tr><tr data-source-line=\"49-49\"><td>Visual impact<\/td><td>Visible array, rails, edge gaps<\/td><td>Flush and in-plane with the roof<\/td><\/tr><tr data-source-line=\"50-50\"><td>Best roof type<\/td><td>Flat or low-slope, large open areas<\/td><td>Pitched roofs, roughly 15\u00b0\u201360\u00b0<\/td><\/tr><tr data-source-line=\"51-51\"><td>Installer<\/td><td>PV installer over an existing roofer<\/td><td>Roofer and electrician working as one team<\/td><\/tr><tr data-source-line=\"52-52\"><td>Timing<\/td><td>Any time after the roof is finished<\/td><td>During new build or a full re-roof<\/td><\/tr><tr data-source-line=\"53-53\"><td>Replacing a roof later<\/td><td>Panels must come off and go back on<\/td><td>The roof <em>is<\/em> the array<\/td><\/tr><tr data-source-line=\"54-54\"><td>Wind and snow path<\/td><td>Loads pass through rails and penetrations<\/td><td>Loads pass through the tile fixing system<\/td><\/tr><tr data-source-line=\"55-55\"><td>Color options<\/td><td>Mostly black or blue<\/td><td>Black, grey, terracotta, and custom colors<\/td><\/tr><\/tbody><\/table><\/div><h3 id=\"why-these-differences-matter-to-your-team\" data-source-line=\"57-57\">Why These Differences Matter to Your Team<\/h3><p data-source-line=\"59-59\"><strong>Industry insight:<\/strong> The biggest change isn&#8217;t technical, it&#8217;s contractual. With panels, the roofer and the PV installer each own a clear scope. With tiles, the waterproofing and the electrical system share the same parts. If nobody writes down who owns the flashing interface, that&#8217;s where most warranty disputes start.<\/p><p data-source-line=\"61-61\">For architects, the draw is design freedom: the roof reads as one surface. For contractors, it&#8217;s a way to stand out in a bid. A firm that can deliver a watertight, code-compliant BIPV roof competes in a smaller pool than a firm that only installs racks.<\/p><p data-source-line=\"63-63\">For a deeper technical breakdown, see our <a href=\"https:\/\/jmbipvtech.com\/es\/solar-roof-tiles-vs-traditional-panels-comparison\/\" target=\"_blank\" rel=\"noopener noreferrer\">side-by-side comparison of solar tiles and traditional panels<\/a>, or read up on <a href=\"https:\/\/jmbipvtech.com\/es\/roof-integrated-solar-tiles-how-they-work-benefits-guide\/\" target=\"_blank\" rel=\"noopener noreferrer\">how roof-integrated solar tiles work<\/a>.<\/p><hr data-source-line=\"65-65\" \/><h2 data-source-line=\"67-67\">Ideal Applications for Commercial Buildings<\/h2><p data-source-line=\"69-69\">Some commercial buildings suit solar roof tiles much better than others because of their roof shape, visibility, and energy use. Being honest about fit is what keeps a project from going over budget.<\/p><h3 id=\"where-solar-roof-tiles-win\" data-source-line=\"71-71\">Where Solar Roof Tiles Win<\/h3><div class=\"table-container\"><table class=\"table-scroll-init\" data-source-line=\"73-80\"><thead data-source-line=\"73-73\"><tr data-source-line=\"73-73\"><th>Tipo de edificio<\/th><th>Why Tiles Fit<\/th><th>Typical Driver<\/th><\/tr><\/thead><tbody data-source-line=\"75-80\"><tr data-source-line=\"75-75\"><td>Retail flagships and showrooms<\/td><td>Street-facing pitched roofs where brand image matters<\/td><td>Design and marketing value<\/td><\/tr><tr data-source-line=\"76-76\"><td>Hotels and resorts<\/td><td>Guests see the roof, and heritage or planning limits are common<\/td><td>Planning approval<\/td><\/tr><tr data-source-line=\"77-77\"><td>Office campuses and HQs<\/td><td>ESG reporting and green certification targets<\/td><td>LEED\/BREEAM credits<\/td><\/tr><tr data-source-line=\"78-78\"><td>Schools, universities, public buildings<\/td><td>Long ownership horizon and public visibility<\/td><td>Public-sector mandates<\/td><\/tr><tr data-source-line=\"79-79\"><td>Car dealerships and service centers<\/td><td>Large pitched canopies, daytime load, EV charging<\/td><td>Energy cost plus EV demand<\/td><\/tr><tr data-source-line=\"80-80\"><td>Heritage-zone and mixed-use infill<\/td><td>Rack panels are often refused on visible roofs<\/td><td>Planning approval<\/td><\/tr><\/tbody><\/table><\/div><h3 id=\"where-panels-usually-make-more-sense\" data-source-line=\"82-82\">Where Panels Usually Make More Sense<\/h3><p data-source-line=\"84-84\"><strong>Industry insight:<\/strong> Big flat-roof warehouses and logistics centers are usually a <em>poor<\/em> fit for tiles. Tiles need slope to shed water, and on a roof nobody can see, the design benefit is zero. On those buildings, ballasted racks or metal-roof integrated systems give a lower cost per kWh. A supplier who tells you this up front is protecting your margin, not losing a sale.<\/p><h3 id=\"worked-example%3A-retail-showroom-roof\" data-source-line=\"86-86\">Worked Example: Retail Showroom Roof<\/h3><p data-source-line=\"88-88\">This is an illustrative calculation. Use PVWatts or PVsyst for real project numbers.<\/p><div class=\"table-container\"><table class=\"table-scroll-init\" data-source-line=\"90-98\"><thead data-source-line=\"90-90\"><tr data-source-line=\"90-90\"><th>Input<\/th><th>Valor<\/th><\/tr><\/thead><tbody data-source-line=\"92-98\"><tr data-source-line=\"92-92\"><td>Pitched roof area<\/td><td>1,200 m\u00b2<\/td><\/tr><tr data-source-line=\"93-93\"><td>Active (solar) share after setbacks, ridges, and valleys<\/td><td>70% \u2192 840 m\u00b2<\/td><\/tr><tr data-source-line=\"94-94\"><td>Tile power density<\/td><td>150 W\/m\u00b2<\/td><\/tr><tr data-source-line=\"95-95\"><td>System size<\/td><td>about 126 kWp<\/td><\/tr><tr data-source-line=\"96-96\"><td>Specific yield (mid-latitude, south\/west-facing)<\/td><td>about 1,200 kWh\/kWp\/year<\/td><\/tr><tr data-source-line=\"97-97\"><td>Annual generation<\/td><td>about 151,000 kWh<\/td><\/tr><tr data-source-line=\"98-98\"><td>Value at $0.15\/kWh commercial tariff<\/td><td>about $22,700\/year<\/td><\/tr><\/tbody><\/table><\/div><p data-source-line=\"100-100\">A showroom uses most of its power during daylight hours for lighting, HVAC, and display screens, so most of that generation is used on site instead of being sold back to the grid at a low export rate. <strong>Self-consumption<\/strong>, meaning the share of solar power used inside the building, is often the single biggest factor in commercial solar payback.<\/p><p data-source-line=\"102-102\">To check yields for your own site, the free <a href=\"https:\/\/pvwatts.nrel.gov\/\" target=\"_blank\" rel=\"noopener noreferrer\">NREL PVWatts calculator<\/a> gives a solid first pass.<\/p><h3 id=\"what-this-means-for-epcs-and-energy-service-providers\" data-source-line=\"104-104\">What This Means for EPCs and Energy Service Providers<\/h3><p data-source-line=\"106-106\">The best-performing tile projects are designed around the building&#8217;s load profile, not just the roof area. An EPC that matches the tile layout to daytime demand, and plans for future EV charging or battery storage, can offer an energy savings agreement with real confidence behind it.<\/p><p data-source-line=\"108-108\"><img decoding=\"async\" title=\"Photovoltaic roof tile production for commercial BIPV projects\" data-src=\"https:\/\/jmbipvtech.com\/wp-content\/uploads\/2026\/08\/photovoltaic-roof-tiles-manufacturer.jpg\" alt=\"Photovoltaic roof tiles manufacturer production line for commercial projects\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" class=\"lazyload\" style=\"--smush-placeholder-width: 1000px; --smush-placeholder-aspect-ratio: 1000\/1000;\" \/><\/p><hr data-source-line=\"110-110\" \/><h2 data-source-line=\"112-112\">Common Business Benefits and Tradeoffs<\/h2><p data-source-line=\"114-114\">Solar roof tiles offer real benefits, but they also come with tradeoffs that owners and contractors should weigh openly before signing.<\/p><h3 id=\"the-benefits\" data-source-line=\"116-116\">The Benefits<\/h3><p data-source-line=\"118-118\"><strong>1. Lower energy costs.<\/strong> Every kWh made and used on site replaces a kWh bought at the retail commercial rate, often including demand-related charges.<\/p><p data-source-line=\"120-120\"><strong>2. The roof replacement offset.<\/strong> This is the most overlooked number in the business case. The fair comparison isn&#8217;t <em>tiles vs. panels<\/em>. It&#8217;s <em>tiles vs. a new roof plus panels<\/em>. If the building needs a new roof anyway, the conventional roofing budget comes off the solar tile cost.<\/p><p data-source-line=\"122-122\"><strong>3. Property value and leasability.<\/strong> Green-certified commercial buildings tend to get stronger rents and valuations in many markets, and a flush solar roof is also an easy story for tenants and investors to understand.<\/p><p data-source-line=\"124-124\"><strong>4. Design flexibility.<\/strong> Custom colors, sizes, and even curved profiles let architects keep the design intent. Jia Mao Bipv, for example, makes <a href=\"https:\/\/jmbipvtech.com\/es\/producto\/cigs-curved-solar-roof-tiles-bipv\/\" target=\"_blank\" rel=\"noopener noreferrer\">CIGS curved solar roof tiles<\/a> for roofs where flat modules can&#8217;t follow the curve. CIGS (copper indium gallium selenide) is a thin-film solar technology that handles curved surfaces and low light well.<\/p><h3 id=\"the-tradeoffs\" data-source-line=\"126-126\">The Tradeoffs<\/h3><p data-source-line=\"128-128\"><strong>1. Higher upfront cost per watt.<\/strong> Tiles cost more per watt than racked panels. Smaller units mean more connectors, more labor, and more flashing details.<\/p><p data-source-line=\"130-130\"><strong>2. Lower power density.<\/strong> Expect less kWp from the same roof area than panels would give, especially with colored or terracotta finishes. Colored coatings can cut output noticeably.<\/p><p data-source-line=\"132-132\"><strong>3. Maintenance access.<\/strong> You can&#8217;t lift one tile the way you can unclip a panel. Before specifying, confirm that single tiles can be swapped without disturbing the tiles around them.<\/p><p data-source-line=\"134-134\"><strong>4. Supply chain lead times.<\/strong> Custom colors and profiles can take many weeks to produce. Late orders are a common cause of schedule slips.<\/p><h3 id=\"illustrative-cost-comparison-(per-m%C2%B2-of-roof)\" data-source-line=\"136-136\">Illustrative Cost Comparison (per m\u00b2 of roof)<\/h3><p data-source-line=\"138-138\"><img decoding=\"async\" title=\"Illustrative installed cost per m2: panels vs solar roof tiles\" src=\"https:\/\/quickchart.io\/chart?w=800&amp;h=450&amp;c=%7Btype%3A%27bar%27%2Cdata%3A%7Blabels%3A%5B%27Rack%20panels%20only%27%2C%27New%20roof%20%2B%20rack%20panels%27%2C%27Solar%20tiles%20gross%27%2C%27Solar%20tiles%20net%20of%20roof%27%5D%2Cdatasets%3A%5B%7Blabel%3A%27Illustrative%20installed%20cost%20USD%20per%20m2%27%2Cdata%3A%5B340%2C490%2C750%2C600%5D%7D%5D%7D%7D\" alt=\"Bar chart comparing illustrative installed cost per square meter for rack panels, new roof plus panels, and solar roof tiles\" \/><\/p><p data-source-line=\"140-140\"><em>These figures are illustrative planning numbers for a pitched commercial roof. Real costs vary by market, roof shape, and product. For U.S. baselines on rack-mounted systems, see the <a href=\"https:\/\/www.energy.gov\/cmei\/systems\/solar-photovoltaic-system-cost-benchmarks\" target=\"_blank\" rel=\"noopener noreferrer\">DOE solar PV system cost benchmarks<\/a>.<\/em><\/p><p data-source-line=\"142-142\">The chart shows a simple point: once the new-roof budget is counted, the gap between tiles and panels shrinks a lot. On a building that needs re-roofing within five years, the gap can shrink enough that design value and the lower long-term cost of not removing and reinstalling panels settle the decision.<\/p><h3 id=\"where-the-money-goes-in-a-typical-solar-tile-project\" data-source-line=\"144-144\">Where the Money Goes in a Typical Solar Tile Project<\/h3><p data-source-line=\"146-146\"><img decoding=\"async\" title=\"Illustrative cost breakdown of a commercial solar roof tile project\" src=\"https:\/\/quickchart.io\/chart?w=700&amp;h=450&amp;c=%7Btype%3A%27pie%27%2Cdata%3A%7Blabels%3A%5B%27Tiles%20and%20modules%27%2C%27Installation%20labor%27%2C%27Electrical%20BOS%27%2C%27Design%20and%20permits%27%2C%27Flashing%20and%20accessories%27%5D%2Cdatasets%3A%5B%7Bdata%3A%5B45%2C20%2C15%2C10%2C10%5D%7D%5D%7D%7D\" alt=\"Pie chart showing illustrative cost breakdown of a commercial solar roof tile project\" \/><\/p><p data-source-line=\"148-148\"><strong>Electrical BOS (Balance of System)<\/strong> means everything electrical other than the tiles: inverters, cables, connectors, and protection devices.<\/p><p data-source-line=\"150-150\"><strong>Industry insight:<\/strong> Labor and flashing together often make up close to a third of the budget. That&#8217;s why crew training and a factory-matched flashing kit do more to protect margin than winning a small discount on the tiles themselves.<\/p><hr data-source-line=\"152-152\" \/><h2 data-source-line=\"154-154\">Targeted Solutions for Contractors<\/h2><p data-source-line=\"156-156\">Contractors decide whether solar roof tiles succeed on a project. Doing the work well takes specific training, tools, and supplier support.<\/p><p data-source-line=\"158-158\"><img decoding=\"async\" title=\"Solar roof tiles manufacturer supporting commercial contractors\" data-src=\"https:\/\/jmbipvtech.com\/wp-content\/uploads\/2026\/08\/solar-roof-tiles-manufacturer.jpg\" alt=\"Solar roof tiles manufacturer supporting contractors with installation-ready products\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" class=\"lazyload\" style=\"--smush-placeholder-width: 1000px; --smush-placeholder-aspect-ratio: 1000\/1000;\" \/><\/p><h3 id=\"what-a-contractor-needs-before-the-first-tile-goes-down\" data-source-line=\"160-160\">What a Contractor Needs Before the First Tile Goes Down<\/h3><p data-source-line=\"162-162\"><strong>1. Cross-trade crew training.<\/strong> Roofers need basic DC electrical awareness. Electricians need to understand water-shedding details. A mixed crew that trains together on a mock-up roof section makes fewer mistakes on the real roof.<\/p><p data-source-line=\"164-164\"><strong>2. A shop-drawing package from the manufacturer.<\/strong> Ask for fixing layouts, flashing details at ridges, hips, valleys, and eaves, and string wiring diagrams before you price the job.<\/p><p data-source-line=\"166-166\"><strong>3. Clear responsibility lines in writing.<\/strong> Put in the contract that the roofer owns waterproofing at every penetration and the PV contractor owns electrical performance from the junction box outward. Sign off the tile-to-flashing interface jointly.<\/p><p data-source-line=\"168-168\"><strong>4. A realistic procurement timeline.<\/strong> Place custom color or size orders around the 60% construction documents stage, not when the drawings are issued for construction.<\/p><p data-source-line=\"170-170\"><strong>5. Commissioning and handover records.<\/strong> Photos, string test results, and insulation resistance readings protect you if a warranty question comes up later.<\/p><h3 id=\"partnerships-that-reduce-risk\" data-source-line=\"172-172\">Partnerships That Reduce Risk<\/h3><p data-source-line=\"174-174\">Contractors who deliver solar tile roofs well usually work closely with one manufacturer instead of buying on price project by project. That relationship gives them:<\/p><div class=\"table-container\"><table class=\"table-scroll-init\" data-source-line=\"176-182\"><thead data-source-line=\"176-176\"><tr data-source-line=\"176-176\"><th>Support Type<\/th><th>What It Solves on Site<\/th><\/tr><\/thead><tbody data-source-line=\"178-182\"><tr data-source-line=\"178-178\"><td>Pre-bid technical review<\/td><td>Catches structural and electrical conflicts before pricing<\/td><\/tr><tr data-source-line=\"179-179\"><td>On-site first-install support<\/td><td>Cuts the learning-curve cost on project one<\/td><\/tr><tr data-source-line=\"180-180\"><td>Matched non-PV &#8220;dummy&#8221; tiles<\/td><td>Keeps the look consistent in setback and shaded zones<\/td><\/tr><tr data-source-line=\"181-181\"><td>Lead-time commitment letters<\/td><td>Protects the schedule and your liquidated damages exposure<\/td><\/tr><tr data-source-line=\"182-182\"><td>Replacement tile stock<\/td><td>Quick fixes during the defects liability period<\/td><\/tr><\/tbody><\/table><\/div><p data-source-line=\"184-184\">Jia Mao Bipv runs automated production lines with MES traceability, so each module can be traced back through its production record. That helps when a single tile needs replacing years later and the color and electrical rating have to match. Contractors moving into this market can find more practical advice in our <a href=\"https:\/\/jmbipvtech.com\/es\/best-solar-roof-tiles-professional-buyer-guide\/\" target=\"_blank\" rel=\"noopener noreferrer\">professional buyer guide for solar roof tiles<\/a> and in the notes on <a href=\"https:\/\/jmbipvtech.com\/es\/bipv-glass-integration-specialized-contractor-projects\/\" target=\"_blank\" rel=\"noopener noreferrer\">BIPV integration for specialized contractor projects<\/a>.<\/p><p data-source-line=\"186-186\"><strong>Industry insight:<\/strong> A contractor&#8217;s first solar tile project almost never makes money. The second and third do, once the crew has done it before and the supplier relationship is set up. Pick a first project that&#8217;s simple (one roof plane, few penetrations) and treat it as training.<\/p><hr data-source-line=\"188-188\" \/><h2 data-source-line=\"190-190\">Design Considerations for Architects<\/h2><p data-source-line=\"192-192\">Architects have several design issues to work through when they bring solar roof tiles into a commercial project. Settling them early is cheaper than fixing them at the shop drawing stage.<\/p><h3 id=\"design-guidelines\" data-source-line=\"194-194\">Design Guidelines<\/h3><p data-source-line=\"196-196\"><strong>Orientation and pitch.<\/strong> South-facing roofs (north-facing in the southern hemisphere) at 20\u00b0\u201340\u00b0 give the best yield in most mid-latitudes. East and west roofs still work well for buildings with morning or afternoon demand peaks.<\/p><p data-source-line=\"198-198\"><strong>Active vs. inactive zones.<\/strong> Not every tile has to be active. Shaded areas, fire setback zones, and tight corners can take matching non-PV tiles, so the roof looks the same from the street.<\/p><p data-source-line=\"200-200\"><strong>Color and finish.<\/strong> Darker tiles produce the most power. Terracotta or grey finishes keep a traditional look but cost some output. Agree on that tradeoff with the client during concept design.<\/p><h3 id=\"structural-requirements\" data-source-line=\"202-202\">Structural Requirements<\/h3><div class=\"table-container\"><table class=\"table-scroll-init\" data-source-line=\"204-210\"><thead data-source-line=\"204-204\"><tr data-source-line=\"204-204\"><th>Check<\/th><th>Why It Matters<\/th><\/tr><\/thead><tbody data-source-line=\"206-210\"><tr data-source-line=\"206-206\"><td>Dead load (kg\/m\u00b2)<\/td><td>Glass tiles can be heavier than the roofing they replace, so the structure must be checked<\/td><\/tr><tr data-source-line=\"207-207\"><td>Wind uplift at the edge and corner zones<\/td><td>Uplift is highest at eaves, ridges, and corners<\/td><\/tr><tr data-source-line=\"208-208\"><td>Snow load<\/td><td>Tiles must carry snow without cracking or shifting<\/td><\/tr><tr data-source-line=\"209-209\"><td>Thermal movement<\/td><td>Long runs need room to expand and contract<\/td><\/tr><tr data-source-line=\"210-210\"><td>Fire rating of the full assembly<\/td><td>Ratings apply to tile, underlayment, and deck together<\/td><\/tr><\/tbody><\/table><\/div><p data-source-line=\"212-212\">For wind, snow, and seismic loads, U.S. projects refer to <a href=\"https:\/\/www.asce.org\/publications-and-news\/asce-7\" target=\"_blank\" rel=\"noopener noreferrer\">ASCE 7 minimum design loads<\/a>. As a reference point, Jia Mao Bipv tempered PV glass is rated to 4.0 kPa wind pressure, and its encapsulation meets B1-grade flame retardancy under Chinese building material standards. Always check both against the local code for the specific building.<\/p><h3 id=\"aesthetic-integration\" data-source-line=\"214-214\">Aesthetic Integration<\/h3><p data-source-line=\"216-216\">The best solar roofs don&#8217;t look like solar roofs. Some practical tips:<\/p><ul data-source-line=\"218-221\"><li data-source-line=\"218-218\">Put active tiles in continuous fields rather than a scattered pattern, which makes wiring simpler and the roof look cleaner.<\/li><li data-source-line=\"219-219\">Hide junction boxes and cable routes under the tile line or inside ridge details.<\/li><li data-source-line=\"220-221\">Use the same fixing grid for active and inactive tiles so the joint lines stay consistent.<\/li><\/ul><p data-source-line=\"222-222\">When the roof connects with a PV fa\u00e7ade or skylight, coordinate the grid lines early. Our guide to <a href=\"https:\/\/jmbipvtech.com\/es\/bipv-building-enclosure-facade-curtain-wall-design\/\" target=\"_blank\" rel=\"noopener noreferrer\">BIPV fa\u00e7ade and curtain wall design<\/a> explains how those parts line up, and the <a href=\"https:\/\/jmbipvtech.com\/es\/bipv-solar-panel-installation-design-guide\/\" target=\"_blank\" rel=\"noopener noreferrer\">BIPV installation design guide<\/a> covers layout and electrical routing.<\/p><p data-source-line=\"224-224\"><strong>Industry insight:<\/strong> Hold a three-party design review at about 30% design development with the architect, structural engineer, and PV designer. It is the cheapest risk control on a BIPV project. At 90% it&#8217;s too late: changes then mean redesigning panels and re-fabricating.<\/p><hr data-source-line=\"226-226\" \/><h2 data-source-line=\"228-228\">Sustainability and Regulatory Compliance<\/h2><p data-source-line=\"230-230\">Businesses adopting solar roof tiles have to work through sustainability standards and regulations, and knowing them well gives you an edge in bids.<\/p><h3 id=\"key-product-standards\" data-source-line=\"232-232\">Key Product Standards<\/h3><div class=\"table-container\"><table class=\"table-scroll-init\" data-source-line=\"234-241\"><thead data-source-line=\"234-234\"><tr data-source-line=\"234-234\"><th>Standard<\/th><th>What It Covers<\/th><th>Who Asks for It<\/th><\/tr><\/thead><tbody data-source-line=\"236-241\"><tr data-source-line=\"236-236\"><td>IEC 61215<\/td><td>Long-term module durability (heat, humidity, UV, mechanical stress)<\/td><td>Owners, lenders, insurers<\/td><\/tr><tr data-source-line=\"237-237\"><td>IEC 61730<\/td><td>Module electrical and fire safety<\/td><td>Building authorities<\/td><\/tr><tr data-source-line=\"238-238\"><td><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/32158\" target=\"_blank\" rel=\"noopener noreferrer\">IEC 63092-1 BIPV module requirements<\/a><\/td><td>BIPV-specific building function requirements<\/td><td>Architects and facade\/roof consultants<\/td><\/tr><tr data-source-line=\"239-239\"><td>UL 7103 (U.S.)<\/td><td>Integrated BIPV roofing system safety<\/td><td>U.S. building officials<\/td><\/tr><tr data-source-line=\"240-240\"><td>Class A (UL 790 \/ ASTM E108) or EN 13501<\/td><td>Roof fire performance<\/td><td>Code officials and insurers<\/td><\/tr><tr data-source-line=\"241-241\"><td>NEC Article 690 (U.S.)<\/td><td>PV wiring, rapid shutdown, arc fault protection<\/td><td>Electrical inspectors<\/td><\/tr><\/tbody><\/table><\/div><p data-source-line=\"243-243\">Ask suppliers for the actual test certificates for the exact product configuration you&#8217;re using. A marketing sheet isn&#8217;t enough. The <a href=\"https:\/\/iea-pvps.org\/wp-content\/uploads\/2020\/01\/IEA-PVPS_15_R08__Analysis_of_requirements_specifications_regulation_of_BIPV__report.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">IEA PVPS analysis of BIPV requirements and regulation<\/a> is a useful background read on why BIPV products must pass both electrical and building-product tests.<\/p><h3 id=\"policy-drivers-and-incentives\" data-source-line=\"245-245\">Policy Drivers and Incentives<\/h3><p data-source-line=\"247-247\"><strong>European Union:<\/strong> The recast <a href=\"https:\/\/energy.ec.europa.eu\/topics\/energy-efficiency\/energy-performance-buildings\/energy-performance-buildings-directive_en\" target=\"_blank\" rel=\"noopener noreferrer\">Energy Performance of Buildings Directive<\/a> moves new buildings toward zero-emission standards and brings in solar-readiness and phased solar installation duties for many new public and commercial buildings. National rules are being written into law now, so check the local version.<\/p><p data-source-line=\"249-249\"><strong>United States:<\/strong> Commercial solar can qualify for the <a href=\"https:\/\/www.irs.gov\/credits-deductions\/clean-electricity-investment-credit\" target=\"_blank\" rel=\"noopener noreferrer\">Clean Electricity Investment Credit (Section 48E)<\/a>. The 2025 federal tax law tightened the timelines for solar: projects generally had to begin construction by July 4, 2026, or be placed in service by the end of 2027. Rules and guidance are still changing, so check eligibility with a qualified tax advisor. State and utility programs are listed in the <a href=\"https:\/\/www.dsireusa.org\/\" target=\"_blank\" rel=\"noopener noreferrer\">DSIRE incentives database<\/a>.<\/p><p data-source-line=\"251-251\"><strong>Green building certification:<\/strong> LEED, BREEAM, and similar schemes reward on-site renewable generation. BIPV roofs also add to the building&#8217;s sustainability story in ESG reports.<\/p><p data-source-line=\"253-253\"><em>Note: This section is general information, not legal or tax advice. Rules differ by country, state, and project type.<\/em><\/p><h3 id=\"why-compliance-is-a-competitive-advantage\" data-source-line=\"255-255\">Why Compliance Is a Competitive Advantage<\/h3><p data-source-line=\"257-257\"><strong>Industry insight:<\/strong> More and more tenders ask for a compliance matrix before technical scoring even starts. A contractor or distributor who can hand over certificates, BIM objects, and an EPD (Environmental Product Declaration, a verified report on a product&#8217;s environmental impact) in a single package often gets through prequalification while competitors are still collecting paperwork.<\/p><hr data-source-line=\"259-259\" \/><h2 data-source-line=\"261-261\">Counterargument: &#8220;Panels Are Cheaper and More Efficient&#8221;<\/h2><h3 id=\"the-opposing-view\" data-source-line=\"263-263\">The Opposing View<\/h3><p data-source-line=\"265-265\">Critics have a fair point. On cost per watt and watts per square meter, rack-mounted panels beat solar roof tiles. On a large flat roof nobody sees, panels are usually the right choice, and a good advisor should say so.<\/p><h3 id=\"the-rebuttal\" data-source-line=\"267-267\">The Rebuttal<\/h3><p data-source-line=\"269-269\">That comparison only looks at one line of the budget. On the projects where tiles fit best, three other factors change the result:<\/p><div class=\"table-container\"><table class=\"table-scroll-init\" data-source-line=\"271-277\"><thead data-source-line=\"271-271\"><tr data-source-line=\"271-271\"><th>Factor<\/th><th>Panels<\/th><th>Solar Roof Tiles<\/th><\/tr><\/thead><tbody data-source-line=\"273-277\"><tr data-source-line=\"273-273\"><td>New roof cost when re-roofing<\/td><td>Paid on top of the solar cost<\/td><td>Mostly offset, because the tiles are the roof<\/td><\/tr><tr data-source-line=\"274-274\"><td>Removing and reinstalling for future roof work<\/td><td>Likely at least once in 25 years<\/td><td>Not needed<\/td><\/tr><tr data-source-line=\"275-275\"><td>Planning approval on visible roofs<\/td><td>Often slow, sometimes refused<\/td><td>Usually easier<\/td><\/tr><tr data-source-line=\"276-276\"><td>Brand and design value<\/td><td>Neutral or negative<\/td><td>Positive for flagship buildings<\/td><\/tr><tr data-source-line=\"277-277\"><td>Wind uplift points and roof penetrations<\/td><td>Many rail penetrations<\/td><td>Fixings built into the roof system<\/td><\/tr><\/tbody><\/table><\/div><p data-source-line=\"279-279\">On a high-visibility building like a flagship store, hotel, or headquarters, those factors often outweigh the higher upfront cost per watt. The better question isn&#8217;t &#8220;which is cheaper per watt?&#8221; It&#8217;s &#8220;which gives the lowest lifetime cost for <em>this<\/em> roof on <em>this<\/em> building?&#8221;<\/p><hr data-source-line=\"281-281\" \/><h2 data-source-line=\"283-283\">Watch: Solar Roof Tiles vs. Solar Panels Explained<\/h2><p data-source-line=\"285-285\">A clear walkthrough of how solar roof tiles compare with traditional panels on efficiency, cost, and return on investment. It works well for team training or explaining the choice to clients.<\/p><p data-source-line=\"287-287\"><a href=\"https:\/\/www.youtube.com\/watch?v=01C0H1ypLdw\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.youtube.com\/watch?v=01C0H1ypLdw<\/a><\/p><hr data-source-line=\"289-289\" \/><p data-source-line=\"293-293\">Commercial solar roof tiles are a strong alternative to traditional panels. Their advantages come from integration: one system acts as the roof, the power plant, and part of the architecture.<\/p><p data-source-line=\"295-295\">They won&#8217;t suit every building. Flat warehouse roofs will usually stay with panels. On pitched, visible, design-led buildings, and especially buildings due for a new roof, tiles often give better lifetime value than a first look at cost per watt suggests.<\/p><p data-source-line=\"297-297\">For contractors, the opportunity is a specialized service that fewer competitors can deliver. For EPCs, it&#8217;s energy assets built around the building&#8217;s load. For architects, it&#8217;s solar that supports the design rather than fighting it. For distributors, it&#8217;s a product category where technical support is what wins the business.<\/p><p data-source-line=\"299-299\">If you&#8217;re weighing solar roof tiles for an upcoming project, you can browse the <a href=\"https:\/\/jmbipvtech.com\/es\/producto\/\" target=\"_blank\" rel=\"noopener noreferrer\">full BIPV product range<\/a>, read <a href=\"https:\/\/jmbipvtech.com\/es\/solar-roof-tile-maintenance-optimization-guide-contractors\/\" target=\"_blank\" rel=\"noopener noreferrer\">field-tested maintenance protocols for solar roof tiles<\/a>, or <a href=\"https:\/\/jmbipvtech.com\/es\/contacto-jia-mao-bipv\/\" target=\"_blank\" rel=\"noopener noreferrer\">talk to the Jia Mao Bipv engineering team<\/a> about roof drawings, load checks, and lead times. More project guides are on the <a href=\"https:\/\/jmbipvtech.com\/es\/jia-mao-bipv-blog\/\" target=\"_blank\" rel=\"noopener noreferrer\">Jia Mao Bipv blog<\/a>, and company background is on the <a href=\"https:\/\/jmbipvtech.com\/es\/\" target=\"_blank\" rel=\"noopener noreferrer\">Jia Mao Bipv homepage<\/a>.<\/p><hr data-source-line=\"301-301\" \/><h2 data-source-line=\"303-303\">Related FAQs<\/h2><h3 id=\"1.-what-are-the-primary-differences-between-solar-roof-tiles-and-traditional-solar-panels%3F\" data-source-line=\"305-305\">1. What are the primary differences between solar roof tiles and traditional solar panels?<\/h3><p data-source-line=\"306-306\">Solar roof tiles replace the roof covering and make electricity. Traditional panels are mounted on rails above an existing roof. Tiles look flush and integrated, while panels give more power per square meter at a lower cost per watt.<\/p><h3 id=\"2.-how-do-solar-roof-tiles-integrate-with-existing-roofing-materials%3F\" data-source-line=\"308-308\">2. How do solar roof tiles integrate with existing roofing materials?<\/h3><p data-source-line=\"309-309\">They fit into the same batten or deck system as conventional tiles, using manufacturer-matched flashings at ridges, valleys, and edges. Matching non-PV tiles fill shaded or setback zones. Mixing in generic flashings can void the warranty.<\/p><h3 id=\"3.-what-types-of-commercial-buildings-benefit-most-from-solar-roof-tiles%3F\" data-source-line=\"311-311\">3. What types of commercial buildings benefit most from solar roof tiles?<\/h3><p data-source-line=\"312-312\">Pitched, visible buildings benefit most: retail flagships, showrooms, hotels, schools, office campuses, dealerships, and heritage-zone properties. Flat, hidden warehouse roofs usually suit rack panels better.<\/p><h3 id=\"4.-are-there-specific-architectural-styles-that-favor-solar-roof-tiles%3F\" data-source-line=\"314-314\">4. Are there specific architectural styles that favor solar roof tiles?<\/h3><p data-source-line=\"315-315\">Styles with pitched roofs work best, including traditional tiled roofs, modern gabled forms, and curved or vaulted roofs if flexible thin-film tiles are used. Heritage and resort architecture gain the most because visual rules are strict there.<\/p><h3 id=\"5.-what-are-the-cost-implications-of-installing-solar-roof-tiles-versus-panels%3F\" data-source-line=\"317-317\">5. What are the cost implications of installing solar roof tiles versus panels?<\/h3><p data-source-line=\"318-318\">Tiles cost more per watt upfront. When a new roof is needed anyway, subtracting the conventional roofing cost narrows the gap a lot. Over 25 years, avoiding panel removal and reinstallation shrinks it further.<\/p><h3 id=\"6.-how-can-contractors-ensure-proper-installation-of-solar-roof-tiles%3F\" data-source-line=\"320-320\">6. How can contractors ensure proper installation of solar roof tiles?<\/h3><p data-source-line=\"321-321\">Train roofers and electricians together, get full shop drawings from the manufacturer, agree waterproofing and electrical responsibilities in writing, do a mock-up first, and keep commissioning records with photos and test results.<\/p><h3 id=\"7.-what-maintenance-is-required-for-solar-roof-tiles-compared-to-solar-panels%3F\" data-source-line=\"323-323\">7. What maintenance is required for solar roof tiles compared to solar panels?<\/h3><p data-source-line=\"324-324\">Both need regular inspections, monitoring, and gentle cleaning with deionized water and soft brushes. Tiles also need checks on flashings and sealing. Pick products that allow single tiles to be replaced without disturbing their neighbors.<\/p><h3 id=\"8.-are-there-financial-incentives-available-for-businesses-that-install-solar-roof-tiles%3F\" data-source-line=\"326-326\">8. Are there financial incentives available for businesses that install solar roof tiles?<\/h3><p data-source-line=\"327-327\">Often, yes. In the U.S., commercial solar may qualify for the Section 48E investment credit, subject to the tighter 2025 law deadlines, plus state programs. In the EU, national EPBD rules and local subsidies apply. Confirm details with a tax advisor.<\/p><h3 id=\"9.-how-do-solar-roof-tiles-affect-the-resale-value-of-a-commercial-building%3F\" data-source-line=\"329-329\">9. How do solar roof tiles affect the resale value of a commercial building?<\/h3><p data-source-line=\"330-330\">They can support higher valuations by lowering operating costs, helping with green certification, and improving ESG credentials. The effect depends on the market, lease structure, and documented energy performance.<\/p><h3 id=\"10.-what-are-the-environmental-benefits-of-using-solar-roof-tiles-in-commercial-projects%3F\" data-source-line=\"332-332\">10. What are the environmental benefits of using solar roof tiles in commercial projects?<\/h3><p data-source-line=\"333-333\">They produce zero-emission electricity on site, replace a conventional roofing material instead of adding one, lower grid demand at peak daytime hours, and help buildings meet net-zero and zero-emission building targets.<\/p><h3 id=\"11.-how-can-architects-incorporate-solar-roof-tiles-into-their-designs-effectively%3F\" data-source-line=\"335-335\">11. How can architects incorporate solar roof tiles into their designs effectively?<\/h3><p data-source-line=\"336-336\">Plan orientation and pitch early, group active tiles into continuous fields, use matching inactive tiles in shaded zones, hide cabling, coordinate grid lines with any PV fa\u00e7ades, and hold a structural and PV design review at around 30% design development.<\/p><h3 id=\"12.-what-are-the-common-challenges-faced-by-businesses-when-transitioning-to-solar-roof-tiles%3F\" data-source-line=\"338-338\">12. What are the common challenges faced by businesses when transitioning to solar roof tiles?<\/h3><p data-source-line=\"339-339\">Common challenges include a higher upfront budget, long lead times for custom finishes, unclear responsibility between trades, a shortage of experienced installers, and incentive rules that change. Early supplier involvement and clear contracts solve most of them.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Commercial Solar Roof Tiles: What Contractors, EPCs and Architects Need to Know Before Specifying More businesses now want their buildings to make power, not just use it. But for a lot of commercial roofs, the usual answer of rows of racked panels bolted on top doesn&#8217;t fit. A retail flagship on a busy street, a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5447,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"Commercial Solar Roof Tiles: A Guide for Business Roofs","_seopress_titles_desc":"Commercial solar roof tiles vs panels: costs, best building types, design rules and codes for contractors, EPCs and architects.","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"footnotes":""},"categories":[64,65,59],"tags":[],"class_list":["post-5443","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news","category-bipv-industry-trends-market-insights","category-news"],"_links":{"self":[{"href":"https:\/\/jmbipvtech.com\/es\/wp-json\/wp\/v2\/posts\/5443","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jmbipvtech.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/jmbipvtech.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/jmbipvtech.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jmbipvtech.com\/es\/wp-json\/wp\/v2\/comments?post=5443"}],"version-history":[{"count":4,"href":"https:\/\/jmbipvtech.com\/es\/wp-json\/wp\/v2\/posts\/5443\/revisions"}],"predecessor-version":[{"id":5454,"href":"https:\/\/jmbipvtech.com\/es\/wp-json\/wp\/v2\/posts\/5443\/revisions\/5454"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/jmbipvtech.com\/es\/wp-json\/wp\/v2\/media\/5447"}],"wp:attachment":[{"href":"https:\/\/jmbipvtech.com\/es\/wp-json\/wp\/v2\/media?parent=5443"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/jmbipvtech.com\/es\/wp-json\/wp\/v2\/categories?post=5443"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/jmbipvtech.com\/es\/wp-json\/wp\/v2\/tags?post=5443"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}